FLARE SYSTEM START-UP PURGE

Status
Not open for further replies.

Monagas

Chemical
Joined
Mar 1, 2005
Messages
64
Location
VE
Hi everyone

We are planning to start up a gas compression plant, and want to purge the vent pipe ( 1600 ft long aprox.), K.O.D and flare stack with raw gas.

The only place to monitor Oxygen concentration is a valve at connection for a manometer on the K.O.D. Could you please provide some advice about if this is a good place to monitor O2 concentration or there is a another common practice to purge and monitot this system.

Thanks in advance
 