sac32079
Mechanical
- May 27, 2011
- 18
I have a campus that I am designing a fire pump and tank for. I have an ESFR system along with various OH GP 1 & 2 systems. The hose requirement for the ESFR is 500 gpm. Do I have to add the hose for the 750 gpm standpipe system thats going to be installed in the OH building? Or would you think that the the ESFR system is the most demanding? Also there is a hydrant attached to the pipe entering the tank and a hydrant on the pump discharge side outside of the building. I have never done a design like this before and it seems to be a little confusing to me. I have no guidance here and i dont want to fail. I just need a little bit help understanding these requirements.