sirs,
im currently conducting tests on our subgrade for embankment and im a little confused between the calculation and the definition of;
a. fill dry density
b. cylinder dry density
admittedly, im still new in this field and needs all of the help you can extend. further may i know if my calculations are correct.
fill dry density=in place wet density/(1+water content at field
condition/100)
maximum dry density= max wet density/ (1+(in situ moisture
content+moisture content at graph/100))
cylinder dry density= converted wet density at 0 point in the graph/
(1+ insitu moisture content)
hope you can help me with this one. thank you in advance for the inputs...
im currently conducting tests on our subgrade for embankment and im a little confused between the calculation and the definition of;
a. fill dry density
b. cylinder dry density
admittedly, im still new in this field and needs all of the help you can extend. further may i know if my calculations are correct.
fill dry density=in place wet density/(1+water content at field
condition/100)
maximum dry density= max wet density/ (1+(in situ moisture
content+moisture content at graph/100))
cylinder dry density= converted wet density at 0 point in the graph/
(1+ insitu moisture content)
hope you can help me with this one. thank you in advance for the inputs...