SteveGregory
Structural
We typically show the outstanding legs of the clip angles welded to the embed plate along the outer vertical edge with a 2X (or 1/2") return on the top at the corner. It is my understanding that this provides some flexibility for a simple shear connection.
Well, the contractor welded the entire length of the top edges of the angles to the embed plates. Should I have these welds "cut" off? Or what?
Well, the contractor welded the entire length of the top edges of the angles to the embed plates. Should I have these welds "cut" off? Or what?