ghmail
Mechanical
- Dec 9, 2011
- 2
Hello All,
We are having a contractor replace the feedwater piping between the feedwater pumps and the boilers. The feedwater is at 200 deg. F and 200 psig.
Is schedule 40 steel pipe adequate or is schedule 80 required?
I do not have a copy of ASME B31.1 available at this time, but it is on order.
Thank you.
We are having a contractor replace the feedwater piping between the feedwater pumps and the boilers. The feedwater is at 200 deg. F and 200 psig.
Is schedule 40 steel pipe adequate or is schedule 80 required?
I do not have a copy of ASME B31.1 available at this time, but it is on order.
Thank you.