High alumina cements will produce high early strengths. Do you really need the strengths that quickly, though? Be sure you actually need to strip forms or move quicker than standard concrete will gain its strength (about 70 percent f'c in 7 days). Properties of high alumina and magnesium phosphate are not as predictable or as well known as Standard Type I portland cement. Also, you will pay a significant premium for these cements, and availability might not always coincide with your schedule. Ready mix suppliers don't usually have means of storage for high quantities of these materials. More often they are using admixtures to achieve similar results in "standard" pcc.