bhart192
Civil/Environmental
- Feb 6, 2006
- 81
I have a prefab building, the metal bldg. manufacturer has given me the maximum column loads per UBC 2006,the loads are already combined(for example col 1 has a total load of 35 kips) these numbers do not break out the dead,live ,wind etc. since most footing design takes into consideration factored loads how should I address the footimg design using a single combined load that is the result of the load combinations. hope this makes sense.