When I was in the shipyard industry we always had a planning and estimating department that provided the manhours to perform any assigned tasks. i.e: pipe welding,
structure welding, tacking, etc. Now I am on my own working with a few small companies (SBA's) and have to perform this guestimate myself. I know they had a gouge that gave you linear feet, pipe diameter, thickness's etc for figuring out the manhours. My first major project is a
23 ft X 9 ft - 6 in 6061 aluminum boat. Duh ? How many mahours (roughly) to fit up and weld this boat ? Thank you for your time, it is appreciated.
structure welding, tacking, etc. Now I am on my own working with a few small companies (SBA's) and have to perform this guestimate myself. I know they had a gouge that gave you linear feet, pipe diameter, thickness's etc for figuring out the manhours. My first major project is a
23 ft X 9 ft - 6 in 6061 aluminum boat. Duh ? How many mahours (roughly) to fit up and weld this boat ? Thank you for your time, it is appreciated.