sag04
Structural
- Jun 5, 2004
- 17
I'm working on a 35 storey twin tower with combined ground &parking floors (P1, P2 ,P3) in which expansion joints are located both in X & Y direction. At each expansion joints there is two columns 2 cm apart resting on pile foundation with pile cap.The pile cap is combined one for both the column. The problem is our client engineer insists for expansion joint must start from pile foundation itself . ie, seperate pile cap for each coulmn set apart 2 cm spacing at expansion joints. But design engineer says expansion joints starts from column only and no need to provide expansion joints in pile cap. Who is correct client engineer or design engineer? please comment and save me from this dilemma...
thanks a lot
regards
thanks a lot
regards