delagina
Structural
- Sep 18, 2010
- 1,008
I have existing purlins made of steel tubing. It needs to be extended 3' overhang. What is the best BOLTED moment connection detail for this? Since it's a purlin it has existing roof. They want roof extended 3' overhang.
This cannot be field welded for a couple of reasons.
I work inside a plant. Welding requires hot work permit which they (boss) prefer not to do. Electrical guys don't want any field welding done because it may cause issues with the existing electrical equipment that the roof/shed is covering.
The detail I have come up is shop weld a plate inside a new tubing purlin, with about 1' of plate protuding out. Then shove in the protruding plate inaide the existing purlin and bolt it.
This cannot be field welded for a couple of reasons.
I work inside a plant. Welding requires hot work permit which they (boss) prefer not to do. Electrical guys don't want any field welding done because it may cause issues with the existing electrical equipment that the roof/shed is covering.
The detail I have come up is shop weld a plate inside a new tubing purlin, with about 1' of plate protuding out. Then shove in the protruding plate inaide the existing purlin and bolt it.