ukengineer58
Civil/Environmental
- Oct 28, 2010
- 182
hi. i have an existing structure originally designed with moment connections to several beams although not high loads. under the new condition the moment Capacity is exceeded. so my question is could assume that the connection will not transfer the full moment and recheck the beam as simply supported. it passes. The truth is somewhere between i guess but to my mind the connection will transfer as much moment as it can then the rest back to the beam. what are your thoughts.