DCBII
Structural
- Apr 15, 2010
- 187
I've got a situation where I'm being asked to expand an existing structure. The existing structure was built with a corbel to plan for future expansion. The only problem is, the existing corbel is not detailed correctly. The anchor bar is not welded, and the ties do next extend 2/3*d down the corbel. How would you approach this problem?