Hi, I just want to ask what is the usual size of auto-meshing do you assign for slabs (assigned as membrane) in a framed structure (those with beams & col). I found out that the more i mesh the better the accuracy but i am wondering if you have a high rise structure and you mesh the slabs by 1m x 1m. that would take alot of time. so I am just want to know the usual rule of thumb regarding the auto-meshing of slabs.
another thing i usually assign the interior wall loads as a null beam with a load, the interior wall (usually light bricks) will be placed on slabs. i also noticed that if i auto mesh the slabs into smaller sizes (say 1x1m), the moment & shear diagrams on the beams become much realistic, but if i use the default meshing, the resulting moment & shear is a bit far off from what i am expecting. then again the question is, if i have a high rise structure (say 40 sty) and i mesh all my slabs by say 1m x 1m. think it will take ETABS a long time just to analyze my model.
any advice on this would be appreciated.
another thing i usually assign the interior wall loads as a null beam with a load, the interior wall (usually light bricks) will be placed on slabs. i also noticed that if i auto mesh the slabs into smaller sizes (say 1x1m), the moment & shear diagrams on the beams become much realistic, but if i use the default meshing, the resulting moment & shear is a bit far off from what i am expecting. then again the question is, if i have a high rise structure (say 40 sty) and i mesh all my slabs by say 1m x 1m. think it will take ETABS a long time just to analyze my model.
any advice on this would be appreciated.