Tek-Tips is the largest IT community on the Internet today!

Members share and learn making Tek-Tips Forums the best source of peer-reviewed technical information on the Internet!

  • Congratulations TugboatEng on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Equations

Status
Not open for further replies.

Sublimenalmssage

Structural
Joined
Jun 14, 2013
Messages
5
Location
US
I'm assembling a structure using my subassemblies, basically each part is 4' and eventually adds up to 12'. Is there a way for solidworks to take the 3 different subassemblies add them together and spit out 12' in a build list. Maybe creating an equation to each part in the configuration. I want this to be interchangeable as well so If I have (2) 4' sections and a 2' section I want that template to spit out 10' or 120"
 
Sublim
Can you create configurations for each of the subs to drive your top level?
 
Status
Not open for further replies.

Part and Inventory Search

Sponsor

Back
Top