LCid
Civil/Environmental
- Nov 17, 2009
- 28
What would be the main reason(s) for encasing in concrete a 48-inch steel main crossing perpendicularly under another 48-inch steel main? The main is to be encased even if the specified minimum (12") clearance between the mains is achieved.