Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
Because FERC says so. Our UFLS scheme is part of a coordinated wide area plan among many utilities, it includes multiple steps and a certain amount of auto restored load if the scheme overshoots. Where we are a major wide area problem is likely to leave us in an overfrequency condition and the Chief Joe brake will slow the system as generation is dropped.Mbrooke said:Why is NERC so strict?