hi good people,compliments of the season and good work you have been doing here.
please i need some assistance with my project.i am trying to design a maintenance programme for our diesel/gas turbine generators
the turbines were installed and commissioned in 1981.they are Ruston TB5400,3MW generators.they were initially just diesel fuelled,but wrer upgraded to use gas in 1992.
when i joined the company,i observed that the generators were producing 2.3MW,average and 2.6MW,peak.this to me is unacceptable.and i took it as my first project to get a maintenance program that will increase the reliability and maintenability and hence availability of the turbine generators.also,whenever there is gas supply failure and we run the turbines on diesel,if gas supply is restored,there is always the need to change the burners and clean them of carbon accumulation before we can start them on gas.this takes close to five hours,in which time our consumersare left without power supply unless we use the stand-by generators,which is expensive,considering the cost of diesel.
what i need is information from studies and previous experience,and possibly applied maintenance programs.
thanks a whole lot
please i need some assistance with my project.i am trying to design a maintenance programme for our diesel/gas turbine generators
the turbines were installed and commissioned in 1981.they are Ruston TB5400,3MW generators.they were initially just diesel fuelled,but wrer upgraded to use gas in 1992.
when i joined the company,i observed that the generators were producing 2.3MW,average and 2.6MW,peak.this to me is unacceptable.and i took it as my first project to get a maintenance program that will increase the reliability and maintenability and hence availability of the turbine generators.also,whenever there is gas supply failure and we run the turbines on diesel,if gas supply is restored,there is always the need to change the burners and clean them of carbon accumulation before we can start them on gas.this takes close to five hours,in which time our consumersare left without power supply unless we use the stand-by generators,which is expensive,considering the cost of diesel.
what i need is information from studies and previous experience,and possibly applied maintenance programs.
thanks a whole lot