GeoBo
Geotechnical
- Jul 13, 2010
- 11
I noted that people would use different expressions for set criteria of driven piles. For example, 4 mm/blow or 40 mm/10 blows. Can I say they are the same? Thanks.
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.