gtfriday
Mechanical
- May 14, 2008
- 3
We are in the middle of combining two companies into one and need to standardize a few things. One major issue is at one location the Part Number and the Drawing Number are one in the same. At the other location we have a number for the Part and a separate number for the Drawing. In the first location Part number = Drawing number so it is easy to find the drawing for a piece part. In the second location the part and the drawing are linked via the PLM so you must go one level deep in the structure of a part to find the drawing. What are the 'best practices' ? do you see Part number = Drawing number as best or a separate Drawing number from the part number.