Schneidly
Structural
- Jun 9, 2010
- 19
I am looking at installing a drag strut in an existing CMU building. The roof consists of a 1 ½” deep 18 gage steel roof deck spanning perpendicular to the new drag strut. The roof joists are “16H5” spanning 27ft at 6ft oc. I have to install the drag strut from under thus the fasteners would go through the steel member. The drag force is on the order of 17.8 kips ultimate. The length of diaphragm I have to attach to is 58 ft.
There is 1 ½ inches of rigid insulation above the roof deck and above that built-up roof. The roof is basically flat.
What member connection should I use and what sort connection should I use?
Thanks.
There is 1 ½ inches of rigid insulation above the roof deck and above that built-up roof. The roof is basically flat.
What member connection should I use and what sort connection should I use?
Thanks.