A 60 acres site will be developped with commercial + multi residential lots.
Review Angency #1 ask, for each of the commercial and multi-residential lots, that the 50-year peak flow rate doesn't exceed 4.2 cfs/acres after developpment.
Review agency (#2) ask that the overall peak flows = or < a 100-year storm associated with pre-developpement conditions.
Question: How to design a detention pond for both agency #2 ?
Or should we forget #1 and design it with pre/post conditions for a 2 to a 100-year storm.
Agency #1 is more concerned about conduits capacity (network) and Agency #2 by streams (Environment).
Review Angency #1 ask, for each of the commercial and multi-residential lots, that the 50-year peak flow rate doesn't exceed 4.2 cfs/acres after developpment.
Review agency (#2) ask that the overall peak flows = or < a 100-year storm associated with pre-developpement conditions.
Question: How to design a detention pond for both agency #2 ?
Or should we forget #1 and design it with pre/post conditions for a 2 to a 100-year storm.
Agency #1 is more concerned about conduits capacity (network) and Agency #2 by streams (Environment).