Dose the ASME U stamp status changes for new pressure vessel/column in case, if vendor need to weld at site 1) External on pressure retaining part 2) internal welding over the SS cladding on KSC shell 3) internal direct welding over the pressure retaining parts.
If the status changes from U stamp to A1 or R1, does the value of equipment reduce if it is insured.