Hemifun
Structural
- Apr 7, 2007
- 58
I have a project going on right now that had a concrete pour last week where the entrained air content was consistently low. The plant kept adjusting the AEA(air entrainment admixture) but still stayed on the low side. The contractor has asked me if we still low air on the additional pours if he can add the AEA to the truck on site. My initial reaction is to deny that request but told him I would look into it. So, has anyone ever done this? Any suggested guidance on this request? Thanks.