Hey guys I need your help.
I have an existing 2x6 culvert approx 1.8' under an railroad track. I was going to replace it with 42" Class 54 or 56 DIP(.017%) but I have no room for elevation change. The Prop DIP will be around 1.8' below the bottom of the track. Do you guys have any idea what I should do? I got the OK from the RR to "open Cut". Would the class 54 or 56 hold up to an E-80 load rating giving the cover. ALso, I tried to 2X barrells but still would put me around 2-30" pipes and also tried to used concrete elliptical=no help. Thanks again
I have an existing 2x6 culvert approx 1.8' under an railroad track. I was going to replace it with 42" Class 54 or 56 DIP(.017%) but I have no room for elevation change. The Prop DIP will be around 1.8' below the bottom of the track. Do you guys have any idea what I should do? I got the OK from the RR to "open Cut". Would the class 54 or 56 hold up to an E-80 load rating giving the cover. ALso, I tried to 2X barrells but still would put me around 2-30" pipes and also tried to used concrete elliptical=no help. Thanks again