Hi all,
We have an OWSJ roof system and a detail that shows the chord angle lag screwed to the 2x4 blocking between the OWSJ, and the 2x4 blocking is connected to the two top plates of the stud wall using Simpson Strong Tie's A21 Tie. The contractor on site did none of this and went ahead and installed the metal deck. I am looking for a fix without having to destroy the deck.
I am thinking of connecting the wood sheathing to the chord angle and then adding nails from the sheathing to the two top plates. My question is: How can I fasten my sheathing to the chord angle? Simpson Strong Tie's products are not readily available where this building is.
Thanks,
Clansman
If a builder has built a house for a man and has not made his work sound, and the house which he has built has fallen down and so caused the death of the householder, that builder shall be put to death." Code of Hammurabi, c.2040 B.C.
We have an OWSJ roof system and a detail that shows the chord angle lag screwed to the 2x4 blocking between the OWSJ, and the 2x4 blocking is connected to the two top plates of the stud wall using Simpson Strong Tie's A21 Tie. The contractor on site did none of this and went ahead and installed the metal deck. I am looking for a fix without having to destroy the deck.
I am thinking of connecting the wood sheathing to the chord angle and then adding nails from the sheathing to the two top plates. My question is: How can I fasten my sheathing to the chord angle? Simpson Strong Tie's products are not readily available where this building is.
Thanks,
Clansman
If a builder has built a house for a man and has not made his work sound, and the house which he has built has fallen down and so caused the death of the householder, that builder shall be put to death." Code of Hammurabi, c.2040 B.C.