1.) Is there a way in my solidworks drawing to fix the arrow of a leader line to a part of my model so that when I change my model the leader will "follow the change" and remain attached to the item I want?
2.) Is it possible to mirror hidden lines that my model has created? Or do I have to manually draw them in?
Thanks Again!
1.) Is there a way in my solidworks drawing to fix the arrow of a leader line to a part of my model so that when I change my model the leader will "follow the change" and remain attached to the item I want?
2.) Is it possible to mirror hidden lines that my model has created? Or do I have to manually draw them in?