Dec 19, 2002 #1 nstress Mechanical Joined Aug 6, 2002 Messages 13 Location IN Hello We are designing a piping system for the Heavy water Upgrading plant for one of the existing Nuclear Power Plant of 220 Mwe PHWR. Can any one of you suggest what special precautions apply? Thanks for sharing your experience. REGARDS
Hello We are designing a piping system for the Heavy water Upgrading plant for one of the existing Nuclear Power Plant of 220 Mwe PHWR. Can any one of you suggest what special precautions apply? Thanks for sharing your experience. REGARDS
Dec 23, 2002 #2 vpl Nuclear Joined Feb 4, 2002 Messages 1,929 Location US nstress I think you need to talk to your client and ask for the original specs so you can get an idea of what they want. Patricia Lougheed Please see FAQ731-376 for tips on how to make the best use of Eng-Tips Forums" Upvote 0 Downvote
nstress I think you need to talk to your client and ask for the original specs so you can get an idea of what they want. Patricia Lougheed Please see FAQ731-376 for tips on how to make the best use of Eng-Tips Forums"