Hoping this is the right forum, as there is the pipelines, piping, and fluid mechanics forum, and the gas distribution engineering forum (which doesn't look well traveled) as well.
I have experience with compressors, compressor stations, and pigging station design, but I have no experience with the design of gas gathering systems. I see a course by Petroskills that would be perfect, but my employer would not pay for such a course (not employed by a midstream company at the moment).
So I'm here asking for references to educational resources on the design of gas gathering systems. I understand that the actual pipeline sizing would be handled by any one of a number of pipeline simulators. What I'm looking for more is guidelines on routing and layout, construction, pressure testing, pigging considerations (I have built one pigging station in my lifetime; I would not consider myself to be a pigging expert but am familiar) API/ASME/etc. codes, rules of thumb, and, well, anything else I haven't mentioned here related to building and optimizing a gathering system.
I spent about 18 months in the midstream business and built three compressor stations so I'm familiar with the concepts involved in designing slug catchers, compressor station layout and utilities, CFR part 192, etc. I just don't know much about the gathering/pipelining side of it.
I appreciate whatever guidance you all can provide. Thanks!
Onwards,
Matt
I have experience with compressors, compressor stations, and pigging station design, but I have no experience with the design of gas gathering systems. I see a course by Petroskills that would be perfect, but my employer would not pay for such a course (not employed by a midstream company at the moment).
So I'm here asking for references to educational resources on the design of gas gathering systems. I understand that the actual pipeline sizing would be handled by any one of a number of pipeline simulators. What I'm looking for more is guidelines on routing and layout, construction, pressure testing, pigging considerations (I have built one pigging station in my lifetime; I would not consider myself to be a pigging expert but am familiar) API/ASME/etc. codes, rules of thumb, and, well, anything else I haven't mentioned here related to building and optimizing a gathering system.
I spent about 18 months in the midstream business and built three compressor stations so I'm familiar with the concepts involved in designing slug catchers, compressor station layout and utilities, CFR part 192, etc. I just don't know much about the gathering/pipelining side of it.
I appreciate whatever guidance you all can provide. Thanks!