GalileoG
Structural
- Feb 17, 2007
- 467
When trying to obtain material quantity of say a 5-10 storey reinforced concrete building, how thorough would your design be? How long do you spend? How close would your rebar and concrete quantity be to that of the final design? Again, this is for cost estimation/bidding purposes only.
Clansman
"If a builder has built a house for a man and has not made his work sound, and the house which he has built has fallen down and so caused the death of the householder, that builder shall be put to death." Code of Hammurabi, c.2040 B.C.
Clansman
"If a builder has built a house for a man and has not made his work sound, and the house which he has built has fallen down and so caused the death of the householder, that builder shall be put to death." Code of Hammurabi, c.2040 B.C.