PSUengineer1:
I agree with what Mjr6550 has suggested. I would just add that this is probably a deck and terrain condition which does beg the need for a GeoTech guy’s involvement. On that steep a slope one of the things that can happen is a slope soil shear failure, starting behind and immediately below the footing bearing level. And, this soil failure condition gets more involved than what most structural engineers want to tackle. It can involve stabilizing the slope below the ftg. so that it can take the ftg. pressure without slope failure.