Nitin Khollamkar
Mechanical
Dear All,
Wants to verify the final pressure at the wash basin inlet point for a G+3 building height of 25m through CPVC down take pipe with a reduction from 10m 32mm dia. pipe then 10m 25mm dia. pipe and last 5m,20mm dia. pipe.
expecting the best
regards
Nitin K
Wants to verify the final pressure at the wash basin inlet point for a G+3 building height of 25m through CPVC down take pipe with a reduction from 10m 32mm dia. pipe then 10m 25mm dia. pipe and last 5m,20mm dia. pipe.
expecting the best
regards
Nitin K