100% visual examination (inside and outside) prior and after PWHT
For CS and normal service (no lethal, no low temperature) hardness test in welds prior and after PWHT (good eng practice)
If RT is required I prefer random UT (good eng practice) in welds prior to PWHT, and RT after.
Obviously hydrotest is after PWHT.
Regards
r6155