Tek-Tips is the largest IT community on the Internet today!

Members share and learn making Tek-Tips Forums the best source of peer-reviewed technical information on the Internet!

  • Congratulations TugboatEng on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Dear All, As per 7.3.2.1 of API650

Status
Not open for further replies.

Gansukh

Petroleum
Joined
Jul 3, 2020
Messages
1
Location
MN
Dear All,
As per 7.3.2.1 of API650, is it mean if customer agree to use ultrasonic method for butt-welds inspection then we can exclude radio-graphic inspection?
Also, can TOFT inspection replace radio-graphic inspection? Thank you.
 
If customer agrees to do nothing, the world becomes heavenly.

DHURJATI SEN
Kolkata, India

 


Pls read again 7.3.2.1 of API650 .( Complete penetration and complete fusion are required for welds joining shell plates to shell plates. Inspection for the quality of the welds shall be made using either the radiographic method specified in 8.1 or alternatively, by agreement between the Purchaser and the Manufacturer, using the ultrasonic method specified in 8.3.1 (see Appendix U)...)

Look to the app .U again...for the butt welds of shell to shell vertical , Shell to shell horizontal ,“T” joints between shell vertical/horizontal, butt welds of Nozzle/manway.....RT is mandatory req. as per the standard.





 
Status
Not open for further replies.

Part and Inventory Search

Sponsor

Back
Top