Tek-Tips is the largest IT community on the Internet today!

Members share and learn making Tek-Tips Forums the best source of peer-reviewed technical information on the Internet!

  • Congratulations TugboatEng on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Corrosion Resistant Overlay 1

Status
Not open for further replies.

GemmellG

Materials
Joined
Jun 28, 2012
Messages
89
Location
CA
Corrosion Resistant Overlay P1 with ER312 (CRO) using GMAW-P single layer approximately 2500 sqft. Work is on a ASME Sec VIII-Div.1 pressure vessel. Base material is SA-516-70 2" thick. ASME Sec VIII-Div.1 Table UCS-56-1 (3).(e) states PWHT is not mandatory if 200F pre-heat is applied throughout the welding first layer. My question is can the welding be done with no pre-heat & no PWHT. Please Note: this is a repair under NBIC.
 
Welding can be done with elevated preheat and no PWHT. Look at Welding Method 5 in the NBIC.
 
Metengr reason for my original post was we did not get a project because our competition stated they have a procedure that does not require Pre-heat or PWHT.
 
Best to not follow the competition, there are companies out there I would not give the time of day for that very reason.
 
I agree thanks again for the great response. You are a great resource. Thanks.
 
Status
Not open for further replies.

Part and Inventory Search

Sponsor

Back
Top