TiagoFigueiredo
Industrial
- May 22, 2013
- 503
Hello,
i'm used to CATIA, but now i'm doing a few works in SW.
I'm trying to copy a sketch from one part to another, but i want the the copied sketch maintains a link to the geometry of the first one. In catia i can past the sketch with link. Then everything that i make to the first sketch will update to the copied one. How can i do it in SW.
Thanks
i'm used to CATIA, but now i'm doing a few works in SW.
I'm trying to copy a sketch from one part to another, but i want the the copied sketch maintains a link to the geometry of the first one. In catia i can past the sketch with link. Then everything that i make to the first sketch will update to the copied one. How can i do it in SW.
Thanks