We are installing VAV controllers in the ceiling plenum of a building. The controllers require 24V and each one is 10 VA rated.
How big of a 24V transformer can we install in the ceiling plenum to provide power to the controllers? What are the limitations by the NEC code? If the controllers, as an example, going to draw 5 amps total, is this allowed by the code?
Thanks
How big of a 24V transformer can we install in the ceiling plenum to provide power to the controllers? What are the limitations by the NEC code? If the controllers, as an example, going to draw 5 amps total, is this allowed by the code?