Mar 22, 2003 #1 mohtogh Chemical Joined Feb 21, 2001 Messages 144 Location CA Hello, For rough estimation,do you have a general rule for cost estimation of a control system of a chemical plant, with a specified control points?(e.g. 2point pressure control,50 points temperature control ...) Thanks