I am designing a 12x3 cast in place box culvert, wherein the south wingwalls need to constructed in sync with the slopewall of an adjacent bridge. The problem is that the bridge slopewall will be built 12-18 months after the construction of the box culvert. What are my options for the construction of the slopewall?
Is construction of the box without the wingwall feasible, in anticipation that they will build the wingwall plus slopewall monolithically in 12-18 months?
Do I need to have some sort of riprap at the wingwall locations if the wingwall is to be constructed at later date OR can I get away without any protection here?
Has anyone had this situation before?
Thanks for the help in advance. This is my first time posting so please let me know if I need to follow any guidelines.
Is construction of the box without the wingwall feasible, in anticipation that they will build the wingwall plus slopewall monolithically in 12-18 months?
Do I need to have some sort of riprap at the wingwall locations if the wingwall is to be constructed at later date OR can I get away without any protection here?
Has anyone had this situation before?
Thanks for the help in advance. This is my first time posting so please let me know if I need to follow any guidelines.