ASCE 37 in addition to ASCE 7-02 deal with load cases for construction.
The literature provided from many manufacturers is very vague in that the literature provided give a weight, but does not define what this weight includes. I am not familiar with the loads of a vibratory roller, however, all the manufacturers info I use on Forklifts is very vague.
How will the roller be used? On a finished structure in use, or during construction?
Good luck,
Daniel