construction costs 3

Status
Not open for further replies.

bleps

Materials
Joined
Aug 2, 2005
Messages
4
Location
US
Looking for a general rule-of-thumb to produce very generic costs for supply/ install 30" CS water line. These numbers will be introduced into conversations as comparative values only (new vs. repair). Typial run lengths approx. 5000 FT.
 
bleps,

It may vary depending on installation method. The RS Means books should be able to help you out.

Jeff


Jeffrey T. Donville, PE
TTL Associates, Inc.
 
I'm sure RS Means can provide the data (and more). We're really just looking for some planning values (i.e. $150 - $200/ LF?)
 
Well call the local supply house for the cost per foot. 8 feet deep with 1:1.5 v:h, excavation will be 5 cu. yds per linear ft.Installation 2hours per pipe segment. Figure it out. Don't lowball the client.
 