mats12
Geotechnical
- Dec 17, 2016
- 181

Hello
Exisitng residental building has strip foundation. New part of building will have foundation slab. I'm wondering what is the best way to connect both foundations?
New structure will be connected to existing on all levels: founations, slabs, roof...
thank you for your reply