pmblair
Structural
- Apr 22, 2011
- 30
My contractor has placed 4" electrical conduit running in my grade beams in the same directions as span for a decent length at 2 locations.
At 1 location it is about 2" above the bottom steel. At the other it actually rests on the bottom steel. I am having them move the pipe higher up in the beams.
My question is is there a ACI reference on how much concrete i need above the bottom bars to transfer the load into the bars?
I am thinking 2"-3" but not sure how i would calculate or if there is a code reference.
Thanks
At 1 location it is about 2" above the bottom steel. At the other it actually rests on the bottom steel. I am having them move the pipe higher up in the beams.
My question is is there a ACI reference on how much concrete i need above the bottom bars to transfer the load into the bars?
I am thinking 2"-3" but not sure how i would calculate or if there is a code reference.
Thanks