PG35
Structural
- Apr 30, 2007
- 25
Are bonding agents typically used to bond the topping to the slabs? If so, what product is recommended. I've seen the topping crack and delaminate from the slabs a few times. In a current job, the concrete is the finished floor. The owner is concerned.
I want to use a bonding agent, WWM and Fibremesh 150. The floor is to have a polished finish.
Any insight will be appreciated.
Thanks,
P
I want to use a bonding agent, WWM and Fibremesh 150. The floor is to have a polished finish.
Any insight will be appreciated.
Thanks,
P