Well, most on-grade site concrete falls under Div 2, where a lot of the time, specific concrete requirements are cross referenced over to the Div 3 concrete section. I guess you need to just use engineering judgement and evaluate the contents of your Div 2 spec to see if it has the necessary elements you want to properly control/specify the concrete.