I am working on a concrete platform project that may have a construction issue due to the limited vertical clearance available to remove the form work for the proposed cast-in-place (CIP) slab. The slab will be between 12 ft to 25 ft in width and the span length varies between 10 ft to 20 ft in length. Currently, there is a 4'-3" minimum vertical clearance available under the slab.
Does anybody know the minimum vertical clearance required for form work removal? Would 4'-3" be sufficient?
Many thanks!
Does anybody know the minimum vertical clearance required for form work removal? Would 4'-3" be sufficient?