sachin-rangari
Structural
- Feb 27, 2017
- 3
I would like to know how to do sampling for a continuous work. I am in a railway project where thousands of foundation are to be done. Each day around 10 foundations (20 meter cube of concrete) are being done. Should I do sampling for each day separately or should i consider for whole project??? The concrete is obtained from same RMC plant.