I am searching for guidelines that denote the specific time/location in which samples of concrete shall be taken for quality control measures. In my case, the concrete samples were taken when the concrete was transferred from the mixing truck to a bucket for transportation to the pour location. There were no samples of concrete taken at the pour location. I have found some information that states that the sampling should be taken at the point of discharge. The discharge in my opinion should be at the pour location.
It would be ideal to find a guideline that dealt directly with transporting concrete from one location to the next without constant aggitation specifically from a shoreline to a pour location in a body of water. I am thinking there is a guideline out ther put out by a department of transportation.
Thanks
It would be ideal to find a guideline that dealt directly with transporting concrete from one location to the next without constant aggitation specifically from a shoreline to a pour location in a body of water. I am thinking there is a guideline out ther put out by a department of transportation.
Thanks