2meterman
Structural
- Dec 6, 2006
- 11
Hello,
I am designing a concrete foundation for a steel pre-engineered building.
The spread footings at each column are located approximately 5 feet below finished grade.
A concrete pilaster (or short column) will be cast on top of the spread footing and then the steel structure will be bolted to the anchor rods that extend out of the top of the concrete pilaster.
The spacing of the anchor rods is very tight in the base plate provided by the steel building manufacturer. I need to constrain the concrete cone failure plane with rebar ties so that I can develop all of the tensile capacity of the anchor rods into vertical deformed bar that will then carry the load into the footing.
The footing really acts as a shoe to prevent uplift since the governing loads on this building are uplift forces from wind.
My question is where to find the required tie spacing that I need to restrain the anchor rods and vertical deformed bar that will transfer the load from the pilaster into the footing.
I have looked in ACI 318 but have not found anything explaining min or max spacing of the ties.
Does anyone know the place to look in ACI 318 for this information? Or better yet, can anyone reference me to a design guide or example for the constraint of the vertical deformed rebar as well as the development length.
Thanks for your help!
I am designing a concrete foundation for a steel pre-engineered building.
The spread footings at each column are located approximately 5 feet below finished grade.
A concrete pilaster (or short column) will be cast on top of the spread footing and then the steel structure will be bolted to the anchor rods that extend out of the top of the concrete pilaster.
The spacing of the anchor rods is very tight in the base plate provided by the steel building manufacturer. I need to constrain the concrete cone failure plane with rebar ties so that I can develop all of the tensile capacity of the anchor rods into vertical deformed bar that will then carry the load into the footing.
The footing really acts as a shoe to prevent uplift since the governing loads on this building are uplift forces from wind.
My question is where to find the required tie spacing that I need to restrain the anchor rods and vertical deformed bar that will transfer the load from the pilaster into the footing.
I have looked in ACI 318 but have not found anything explaining min or max spacing of the ties.
Does anyone know the place to look in ACI 318 for this information? Or better yet, can anyone reference me to a design guide or example for the constraint of the vertical deformed rebar as well as the development length.
Thanks for your help!