I have a project where we poured this architecturally exposed concrete wall. The contractor took 2 days to pull forms.
For some reason, the forms taken off during the 2nd day have left the concrete a unique "darker" color.
Everything, except the form removal, is identical. Same truck, same mix, same forms.
The wall points North.
The south side, curiously, is perfect. No checker board discoloration.
The concrete is about at day 15 in terms of curing process.
The owner is flipping out. No one knows what is going on. The end goal, is that all the concrete needs to match (same color).
Has anyone ever seen this?
PHOTO IS ATTACHED.
For some reason, the forms taken off during the 2nd day have left the concrete a unique "darker" color.
Everything, except the form removal, is identical. Same truck, same mix, same forms.
The wall points North.
The south side, curiously, is perfect. No checker board discoloration.
The concrete is about at day 15 in terms of curing process.
The owner is flipping out. No one knows what is going on. The end goal, is that all the concrete needs to match (same color).
Has anyone ever seen this?
PHOTO IS ATTACHED.