mlevario99
Structural
- Aug 26, 2008
- 26
Hi, I have a question, I design a 5 story concrete building and is in the construction stage. Last week they poured the first part of the first elevated slab, tehy started around 1:00 AM and they finish pouring concrete around 9:30, they had about 560 cu. yd. The contractor wanted to poured about 4 concrete columns on top of the fresh slab by 1:30 PM, one person call us and ask if it was acceptable to pour columns on top of the fresh slab, we tought it was to soon to start pouring concrete on top of the new slab. Is there any ACI information related to this situation, or any of you guys have had the same problem. The strength of the concrete is 5000 psi.
Thaks
Thaks